These are the top risks for Cambridgeshire and Peterborough.
Each risk is graded from 1 to 5 for their impact and their likelihood, then classed as Red, Amber, Yellow or Green. The risks are listed below, divided into their colour rating.
Red risks
These risks have been rated as having high impact and high likelihood.
Failure of the national electricity transmission system (5 impact, 3 likelihood)
Influenza-type disease (5 impact, 3 likelihood)
Radiation release from overseas nuclear accident (4 impact, 4 likelihood)
Variable rota power cuts (4 impact, 3 likelihood)
Amber risks
These risks are more likely to happen, but will have a lower impact.
Systemic financial crisis (3 impact, 5 likelihood)
Volcanic eruption (3 impact, 4 likelihood)
Public disorder (3 impact, 4 likelihood)
Fuel shortages at filling stations (3 impact, 4 likelihood)
Severe space weather (3 impact, 3 likelihood)
Fluvial flooding (3 impact, 3 likelihood)
The growth and spread of antimicrobial resistance (3 impact, 3 likelihood)
Emerging infectious disease (3 impact, 3 likelihood)
Drought (3 impact, 3 likelihood)
Disruption to or loss of telecommunications systems (3 impact, 3 likelihood)
Yellow risks
These risks are less likely to happen and will have a lower impact.
Water infrastructure failure or loss of drinking water (3 impact, 2 likelihood)
Aviation crash (3 impact, 1 likelihood)
Industrial action (firefighters) (2 impact, 5 likelihood)
Industrial action (public transport) (2 impact, 5 likelihood)
Industrial action (prison officers) (2 impact, 4 likelihood)
Accidental release of biological substance (2 impact, 4 likelihood)
Major social care provider failure (2 impact, 4 likelihood)
Technological failure at a retail bank (2 impact, 3 likelihood)
Railway accident (2 impact, 3 likelihood)
Major outbreak of animal disease (2 impact, 3 likelihood)
Surface water flooding (2 impact, 3 likelihood)
Poor air quality (2 impact, 3 likelihood)
Storms (2 impact, 3 likelihood)
Major fire (2 impact, 2 likelihood)
Large toxic chemical release (2 impact, 2 likelihood)
Accident involving high consequence dangerous goods (2 impact, 2 likelihood)
Gas supply failure (2 impact, 2 likelihood)
Food supply contamination (2 impact, 2 likelihood)
Building collapse (2 impact, 2 likelihood)
Industrial action (fuel supply) (2 impact, 2 likelihood)
Reservoir/ dam collapse (2 impact, 2 likelihood)
Coastal flooding (2 impact, 2 likelihood)
Green risks
These risks are considered to have a low impact.
Explosion at a high pressure gas pipeline (2 impact, 1 likelihood)
Bridge closure or building collapse (2 impact, 1 likelihood)
Accidental release of biological pathogen (2 impact, 1 likelihood)
Small scale highly disruptive demonstration (1 impact, 5 likelihood)
Heatwave (1 impact, 4 likelihood)
Low temperatures and heavy snow (1 impact, 4 likelihood)
Influx of British nationals (1 impact, 4 likelihood)
Influx of foreign nationals (1 impact, 4 likelihood)
Radiation exposure from stolen goods (1 impact, 1 likelihood)
Insolvency affecting fuel supply (1 impact, 1 likelihood)
Earthquake (UK) (1 impact, 1 likelihood)